- 2072 Kartik · 2+2+2 marks
Load, capacity and utilization factors
Short answer
Installed capacity = 9.81×0.85×25×150 = 31.27 MW, average load = 220 GWh/8760 h = 25.11 MW. Annual load factor = 25.11/30 = 0.837; capacity factor = 220×10⁶/(31.27×8760) = 0.803; utilization factor = 30/31.27 = 0.959.
A hydropower plant receives design discharge of 25 m³/s from 150 m height. The annual output of the plant is 220 GWh. If the peak load demand is 30 MW, determine (i) annual load factor, (ii) capacity factor and (iii) utilization factor. Assume the overall efficiency of the plant equals 85% and neglect head loss in the penstock.
Installed capacity
Average load
Annual energy kWh.
(i) Annual load factor
(ii) Capacity (plant) factor
(iii) Utilization factor
Check: CF = LF × UF = 0.837 × 0.959 = 0.803.
Answer: load factor = 0.837; capacity factor = 0.803; utilization factor = 0.959.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Load duration curve; diesel plant; ROR flow duration · Hydropower Engineering, chapter 3
- Full regulation: reservoir, capacity, annual energy · Hydropower Engineering, chapter 3
- Francis design (150 m, 25 m³/s) · Hydropower Engineering, chapter 7 · asked 2×
- RoR pondage: capacity and pondage volume · Hydropower Engineering, chapter 3
- Pondage surface area and weekly output · Hydropower Engineering, chapter 3
- Optimizing plant capacity of a RoR project · Hydropower Engineering, chapter 3
- Peak load, load factor and energy from load pattern · Transmission and Distribution System Design, chapter 6 · asked 2×
- Peak demand of load center from load pattern · Transmission and Distribution System Design, chapter 6 · asked 2×
- Firm power and plant load factors · Hydro Power, chapter 3
- 5th year peak load (commercial 30 days) · Transmission and Distribution System Design, chapter 6 · asked 7×